SCOPE Removal of SUSPENDED SOLIDS from WATER and LIQUID Basins STORAGE PROBLEM Solids SETTLING creates SLUDGE FORMATION inside STORAGE Tanks Solids are TRANSPORTED to PLANT and INCREASE Plant OPERATION Costs Solids SETTLING reduces AVAILABLE VOLUMENS of STORAGE Solids SETTLING creates SLUDGE FORMATION inside STORAGE Tanks Solids are TRANSPORTED to PLANT and INCREASE Plant OPERATION Costs Solids SETTLING […]
Process Engineering S.r.l. is the Vendor for the Degassing Tower Revamping Project of BASF ITALIA Spa BASF requirement is to optimize the Steam Cycle of the Plant through the Up-grade of the Degassing UNIT helieR MIXING Bed purposely designed is installed in the Degassing at BASF Chemical Plant After the installation of the specific helieR MIXING Packed BED the Degassing UNIT doubled the efficiency […]
Process Engineering S.r.l. is selected by Technip ITALY Spa for the supply of Special on-drawing STATIC MIXER Supply The supply of Engineering, Equipment and Documennts is part of Technip ITALY Project 1 PHASE of H-OIL & VGO Heavy Residue Hydrocracking Complex Project Number 2394 realized in Bulgaria Static Mixer supply package is formed by Hydrogen […]