Handover of the Engineering – Dosing and Mixing PLANT

CLOSING of the ENGINEERING

PLANT – Dosing & Mixing


On 13.11.2018 the ENGINEERING PHASE commissioned by TEK GROUP to PE – Process Engineering for the characterization and definition of the new plant in Malaysia, in the state of Johor, regarding the new plant

PLANT – Dosing and Mixing

for the     production of bottles

was completed

 

As completion of the ENGINEERING PHASE, the PLANT DRAWINGS – a complete set of documentation from the Process Flow to the Plant Development Views – was handed to the Customer, describing the

innovative technical solutions

proposed for the production of latex cars repair bottles.

 

The delivery of the PLANT DRAWINGS as completion of the ENGINEERING PHASE took place IN ADVANCE compared to the delivery date requested by the Customer.

Pre-feasibility Study – IBN : PRELIMINARY DRAWINGS – BPA PE 1046 Rev 4

Feasibility Study     BPA PE -2014-1046 Rev 4
Project N °                 PE-2014-1046

 

With regard to Client Project

Industrial Plant Project to Manufacture Fittings, Flanges and Process Equipment for the Oil & Gas Industry

on 06,06,2016 PE – Process Engineering handed over to Client the Project PRELIMINARY DRAWINGS

  • TAV 01 Site lay-Out and Equipment Positioning
  • TAV 02 Equipment List and Dimensions – LINE 1 LINE 2 LINE 3

regarding the PROJECT under caption

 

Characterized by an innovative design for the raw materials handling and for the optimization of the exploitation of the resources required by the production of the LINE 1 / LINE 2 / LINE 3 departments, the Lay-Out develops symmetrically on a polygonal of 185 m X 185 m, approximately